引用本文:潘春荣.具有清洗工艺的单臂组合设备终止暂态调度[J].控制理论与应用,2021,38(6):784~794.[点击复制]
PAN Chun-rong.Scheduling of close-down process for single-arm cluster tools with chamber cleaning operations[J].Control Theory and Technology,2021,38(6):784~794.[点击复制]
具有清洗工艺的单臂组合设备终止暂态调度
Scheduling of close-down process for single-arm cluster tools with chamber cleaning operations
摘要点击 1662  全文点击 577  投稿时间:2020-09-07  修订日期:2020-12-31
查看全文  查看/发表评论  下载PDF阅读器
DOI编号  10.7641/CTA.2021.00603
  2021,38(6):784-794
中文关键词  晶圆制造  组合设备  Petri网  清洗工艺  终止暂态
英文关键词  wafer fabrication  cluster tool  Petri net  cleaning operation  close-down process
基金项目  国家自然科学基金项目(51665018)资助.
作者单位E-mail
潘春荣* 江西理工大学机电工程学院 chunrongpan@163.com 
中文摘要
      随着多品种小批量生产模式的普及, 导致了组合设备频繁的暂态加工过程. 为了提高组合设备的生产柔 性, 同时考虑晶圆驻留时间约束和腔室清洗时间约束, 研究了单臂组合设备的终止暂态调度问题. 首先, 提出了1–周 期清洗工艺的暂态调度规则, 并采用了面向资源的Petri网对单臂组合设备的终止暂态过程进行建模, 引入避免死锁 的变迁触发规则; 其次, 根据系统的终止暂态时间特性并考虑不同的调度情形, 建立了终止暂态调度的线性规划模 型; 最后, 通过实例验证了该方法的可行性. 实验结果表明, 与运用改进拉式策略的虚拟晶圆方案相比, 该调度方案 可有效地减少组合设备终止暂态的完工时间, 并满足晶圆制造的工艺要求.
英文摘要
      With the model of multi-variety and small-batch production applied widely, it led to frequent transient process of cluster tools. In order to improve the production flexibility of single-arm cluster tools, the scheduling of close-down process problem is addressed considering the time constraints of wafer residency and chamber cleaning. Firstly, a transient scheduling rule with 1-period of cleaning operations is proposed. Resource-oriented Petri net is used to model the closedown process of single-arm cluster tools and a rule of transition firing is introduced to avoid deadlock. Secondly, according to the close-down process time characteristics of the system and different scheduling situations, a corresponding linear programming model is established to achieve close-down process optimal scheduling. Finally, examples are given to verify the feasibility of the proposed approach. The experimental results show that the scheduling scheme can effectively reduce close-down process makespan of single-arm cluster tools and meet wafer fabrication process requirements, compared with the virtual wafer method based on extended backward strategy.